Leapley Construction completed the construction of a new 3.2-acre parking lot at Shadowbox Studios, an active film and television production campus featuring nine soundstages in southeast Atlanta. The project added 294 parking spaces to support the studio’s ongoing operations.
The scope of work included sewer line replacement, removal of existing railroad tracks, installation of new stairs and a gated access point, landscaping, striping, and signage. Site improvements required careful coordination around existing retaining walls and a stormwater pond, as well as the protection of adjacent trees throughout construction.
Leapley worked closely with the civil engineer and DeKalb County to finalize design details while coordinating construction activities within the active production campus.
Project Details:
Location:
Atlanta, GA
Size:
3.2 acres / 294 parking spots
Client/Owner:
Impact Development
Design Team:
CERM