Piedmont Walton MRI Replacement
Leapley Construction partnered with Piedmont Healthcare to complete the replacement of MRI and Fluoro X-Ray equipment at Piedmont Walton Hospital while maintaining uninterrupted hospital operations. The MRI replacement included the removal of the existing Philips 1.5T system and installation of a new GE Sigma Artist 1.5T unit, construction of a new 350 SF enclosed exterior space to satisfy MRI zoning requirements, and replacement of the RF shield. The Fluoro X-Ray replacement involved interior renovations to accommodate new Siemens fluoroscopy equipment, including upgraded cabinetry, new finishes and flooring, enhanced LED lighting, electrical upgrades, and plumbing modifications at the existing sink. Careful planning and coordination allowed both projects to be executed safely and efficiently within the active healthcare environment.
Project Details:
Location:
Monroe, GA
Size:
350 SF
Client/Owner:
Piedmont Healthcare
Design Team:
Frandsen Architects
Awards:
First Place, Build Georgia Awards, AGC of Georgia, 2026
Award of Excellence, Excellence in Construction Awards, Associated Builders and Contractors of Georgia, 2026

