Kaiser Permanente Cumberland MOB
Leapley Construction completed a two-year, phased renovation of the 93,000 SF, five-story Kaiser Permanente Cumberland Medical Office Building, modernizing the facility’s aging infrastructure and transforming its exterior while maintaining continuous medical operations.
The comprehensive renovation included replacement of the building’s HVAC, electrical, plumbing, and communications systems, with new air handlers and terminal units on every floor, rooftop equipment, and a dedicated outdoor air system (DOAS). Exterior improvements included new windows and doors, protective façade coatings, upgraded signage and entrances, and a distinctive 40-foot-by-40-foot perforated screen wall featuring dynamic branding imagery.
Extensive site improvements enhanced accessibility, traffic flow, and the overall patient experience. Work included relocating the main entrance, reconstructing the primary entry drive and ramp system, adding turn lanes along Cumberland Boulevard, installing new stormwater detention systems and a 20-foot-tall retaining wall, and resurfacing four acres of parking in phases. Additional enhancements included exterior lighting and landscaping.
With the medical office building fully occupied throughout construction, Leapley carefully coordinated each phase to maintain safe access for patients and staff while adhering to strict infection control requirements. Complex infrastructure upgrades required temporary HVAC support, rigorous dust and negative-air controls, and a coordinated 10-day power shutdown to install a new 2,000-amp switchboard—all while minimizing disruption to the facility’s daily operations.
Project Details:
Location:
Atlanta, GA
Size:
93,000
Client/Owner:
Kaiser Permanente
Design Team:
Gresham Smith

